Home>>
Deqing tunnel of Guiyang-Nanning high-speed railway drilled through (2)
(Xinhua) 09:51, August 04, 2021
Technicians use a 3D scanner to collect data inside the Deqing tunnel of the Guiyang-Nanning high-speed railway in Hechi, south China's Guangxi Zhuang Autonomous Region, Aug. 3, 2021. The 6.61-km-long Deqing tunnel was drilled through on Tuesday. It is a critical control project in the construction of the Guiyang-Nanning high-speed railway, which is expected to put into operation by the end of 2023. (Xinhua/Liu Lingyi)
(Web editor: Xia Peiyao, Liang Jun)
Photos
Related Stories
About People's Daily Online | Join Us | Contact Us
Copyright © 2021 People's Daily Online. All Rights Reserved.
Copyright © 2021 People's Daily Online. All Rights Reserved.