Facebook Twitter 新浪微博 google plus Instagram YouTube Friday 31 July 2015
Search
Archive
English
English>>

Drilling rig HYSY 982 to be delivered in August 2016 (2)

(Xinhua)    16:09, July 31, 2015
Email|Print
Workers assemble the drilling rig HYSY 982 at China Oilfield Services Limited in Dalian, northeast China's Liaoning Province, July 31, 2015. HYSY 982 is a sixth generation deep-water semi-submersible drilling rig equipped with DP 3 dynamic positioning system, designed for a maximum operating depth of 5,000 feet (1,524 meters) and a maximum drilling depth of 30,000 feet (9,144 meters). It is expected to be delivered in August 2016. (Xinhua/Yang Qing)

【1】【2】【3】【4】

(For the latest China news, Please follow People's Daily on Twitter and Facebook)
(Editor:Zhang Qian,Bianji)

Add your comment

Most Viewed

Day|Week

Hot News

We Recommend

Photos

prev next

Related reading