New Zealand Prime Minister Jacinda Ardern and Chinese Consul General in Auckland Xu Erwen participate in the 2019 Chinese New Year Festival and Market Day in Auckland, New Zealand, Feb. 2, 2019.
A self-driving tractor equipped with the BeiDou Navigation Satellite System (BDS) runs along the planned routes through the remote control during the second China-Arab States BDS Cooperation Forum in Tunis, capital of Tunisia, April 1, 2019. (Xinhua/Meng Tao) TUNIS, April 2 (Xinhua) -- "It gives me joy, hope and growth.
The level-2 station of the Nam Ou project has been in operation since 2016. The project, with an installed capacity of 1,272 megawatts, is invested in and constructed by Power Construction Corp of China at a cost of $2.