Text Version
RSS Feeds
Newsletter
Home Forum Photos Features Newsletter Archive Employment
About US Help Site Map
SEARCH   About US FAQ Site Map Site News
  SERVICES
  -Text Version
  -RSS Feeds
  -Newsletter
  -News Archive
  -Give us feedback
  -Voices of Readers
  -Online community
  -China Biz info
  What's new
 -
Nuke plant's life cycle set to double
+ -
08:15, October 19, 2007

 Related News
 China sets up expert panel to advise on int'l fusion energy project
 China submits ratification letter of international fusion deal to IAEA
 Chinese vice premier hopes U.S. strength cooperation with China in nuclear power field
 Cooperation in civil nuke-sector welcome
 Comment  Tell A Friend
 Print Format  Save Article
The first phase of Qinshan Nuclear Power Plant (Qinshan-I), China's first nuclear plant, will be able to double its operational life through a cutting-edge plant life management (PLiM) mechanism, the plant's top engineer has said.

"Qinshan-I is 16 years old. We're aware of the issue of life management and we have started introducing the PliM method," Ma Huiming, chief engineer of the Qinshan Nuclear Power Company, told China Daily on the sidelines of an International Atomic Energy Agency (IAEA) symposium on PliM which concluded yesterday.

"With effective plant life management methods, Qinshan-I will probably be able to run another 20-40 years after its 30-year designed life."

"It will save the cost of a new nuke plant if we have Qinshan-I run for another 40 years safely, not to mention the cost for disposing of the expired reactor."

The PliM methodology can help optimize repair, replacement or modification of systems, structures and components of reactors, while ensuring a high level of safety.

Yuri Sokolov, IAEA's deputy director-general also expressed optimism for the mechanism.

"This (PliM) is especially important as the world's fleet of 439 nuclear power plants has been operating, on average, for more than 20 years."

Qinshan-I teams are working with leading academies to conduct regular inspections and assessments of the key equipment in the plant, a core part of the PLiM methodology.

Strict checks on shell-like containment facilities designed to prevent radiation leakage into the atmosphere, are conducted in line with PliM standards.

"Non-destructive testing methods such as ultrasonic testing have been introduced for examination," Ma said.

"As the Qinshan-I is the first nuke power plant in China, nuclear safety is our country's top priority. Fortunately there have been no safety-related aging problems occur."

The Shanghai Nuclear Engineering Research and Design Institute (SNERDI) and the Research Institute of Nuclear Power Operation of Wuhan in Central China, provide PliM technical support for Qinshan-I.

Dou Yikang, a senior engineer with the Shanghai nuclear institute, which designed Qinshan-I, agreed with Ma's expectations for the plant's life, but added it had to undergo sophisticated research and verification processes.

"Technical feasibilities aside, we have to do a series of complex assessments to prove that it will do no harm to the environment and residents," Dou said.

The 300-megawatt Qinshan-I, located in the eastern province of Zhejiang, started operation in 1991. It cost 1.2 billion yuan ($159.76 million) to build the first nuke plant in China at that time.

But it would cost about $450 million to build a similar plant today, based on current construction costs, Dou said.

Source: China Daily



  Your Message:   Most Commented:

|About Peopledaily.com.cn | Advertise on site | Contact us | Site map | Job offer|
Copyright by People's Daily Online, All Rights Reserved

http://english.people.com.cn/90001/90776/6286142.pdf